000 | 00673nam a22002057a 4500 | ||
---|---|---|---|
999 |
_c7449 _d7449 |
||
003 | OSt | ||
005 | 20220701130456.0 | ||
008 | 190829b ||||| |||| 00| 0 eng d | ||
040 | _cThe OUT | ||
082 |
_222 _aEA DIS 658.312509678 MAN |
||
100 | _dMansoury,Faizy S. | ||
245 |
_aRole of Pre-Project Evaluation in Project Performance: _bA Case of Public Projects in Njombe Region / _cFaizy Saidy Mansoury |
||
260 |
_aDar es salaam: _bThe OUT, _c2018 |
||
300 |
_axvii,69p.: _bill.; _c30cm |
||
500 | _aIncludes Bibliographical References and Index | ||
650 | _vPre-Project Evaluation | ||
650 | _vProject Performance | ||
650 | _vPublic Projects | ||
942 |
_2ddc _cBK |